|
||||||||
![]() |
||||||||
Interstate 30/Highway 80 - East Corridor Project Lead Agency: Description: Design will initiate with the preparation and completion of Preliminary Design Schematics and an Environmental Assessment followed by future final (detailed) design and project construction. Cost and Funding: Current Status: Preparation and processing of the Preliminary Design Schematics and Environmental Assessment documents remain underway, all of which must be ultimately reviewed and approved by the Federal Highway Administration in order to progress to a Public Hearing. Public Hearing forecast date is Summer 2010, and exact date and time will be posted on the project website, relayed to elected officials and shared with all who have registered on the website mailing list and property owners who are located within the potential (proposed) right of way zone. For more information on this project please visit the project web page at http://www.theeastcorridor.org |
||||||||
State Highway 190 - East Branch Lead Agency: Description: TxDOT works with the local entities and the public to determine feasible alternatives and alignments for the potential new roadway. TxDOT relies heavily on local leadership and input in determining what alignment works best for each jurisdiction. It is anticipated that the facility would improve local north-south transportation and complete the regional (eastern) SH 190 Loop - connecting the President George Bush Turnpike (PGBT) - Eastern Extension at IH 30 to the proposed Loop 9 at IH 20. Cost and Funding: Current Status: For more information please visit the project web page at http://www.theeastbranch.org/home.htm |
||||||||
SH 352 @ US 80 Lead Agency: Description: Cost and Funding: Current Status: |
||||||||
Collins Road - Tripp Road to US 80 Lead Agency: Description: Cost and Funding: Current Status: |




a No-Build Alternative, and the potential for toll-application to the build alternative alignments are being examined.


